CE 301 - Construction EstimatingCredits: 2 A study of the characteristics, capabilities, and operating costs of equipment and estimation of construction costs. This work will include quantity takeoff, pricing of materials, classifcation of work, labor, overhead, specifications, and bid procedures. Prerequisite(s): ENGR 291 Lecture-Lab (ex: 3-1 means 3 hrs lecture and 1 hr lab): 1-3 Term(s) Offered: Fall