|
|||
CE 301 - Construction EstimatingCredits: 2 A study of the characteristics, capabilities, and operating costs of equipment and estimation of construction costs. This work will include quantity takeoff, pricing of materials, classifcation of work, labor, overhead, specifications, and bid procedures. Prerequisite(s): ENGR 291 Lecture-Lab (ex: 3-1 means 3 hrs lecture and 1 hr lab): 1-3 Term(s) Offered: Fall
Check course availability in Spring 2024 Check course availability in First Summer 2024 Check course availability in Second Summer 2024 Check course availability in Fall 2024 |
|||
All bulletins © 2024 University of Southern Indiana. Powered by the Acalog™ Academic Catalog Management System™ (ACMS™).
|